Help with your seawall project·Lake Martin
Waterfront planning

A practical maintenance record for your Lake Martin wall.

Build a repeatable photo record around rain, changing lake levels and the condition of the wall, then agree on professional checks for your property.

Request plan details

Use the seasons to see more of the wall.

Take comparison photos from the same safe positions. Record the date, recent rain and lake conditions. When the water is lower, photograph newly visible joints, the base and the transitions to riprap without walking onto unstable ground.

Alabama Power identifies drawdown as an opportunity for shoreline access. Water levels can still change, so arrange a visit against current conditions instead of assuming a fixed dry-work window.

Lakeshore use permit request and FAQ · Lake Martin reservoir facts and operations

Observation and repair are different tasks.

A record of loose stone or a blocked outlet is a reason to investigate. It is not permission to excavate or alter the wall. Ask Alabama Power which approval the proposed repair needs; within StillWaters, also confirm the association’s repair category.

Keep the permit drawing, inspection findings and completed-work photos together. The next assessor should be able to identify what changed and what was left in place.

Lakeshore use permit request and FAQ · StillWaters permits

Keep useful records before the next decision.

Use a maintenance record to distinguish a new change from an old condition. Photograph consistent wall segments, keep reports by date and note any recurring runoff or ground settlement.

Observe from stable ground. Leave drilling, excavation and structural work to the appropriately qualified professional after the repair scope and approvals are established. A routine visit should not expand into unapproved construction.

Worried about damage? Check the warning signs.Optional · 10 short questions · no contact details

Answer from what you already know. Stay on safe ground; do not go near the edge or into the water to check. You can choose “Not sure” for any question.

Skip this and go to the request form

1. Holes, sinking ground, or soil washing out behind the wall?
2. Is the wall leaning or bulging toward the water?
3. What cracks have you noticed?
4. Gaps, missing pieces, or soil coming through the joints?
5. Is the top broken or crumbling, or is metal showing?
6. Are there rust stains on the wall?
7. Does water cross or pass through the wall at high lake levels?
8. Has there been a major storm since the wall was last checked?
9. About how old is the wall?
10. When was the last professional inspection?
What this check is based on

The questions cover signs shown in the City of Holmes Beach seawall manual (pages 5–13): soil loss, wall movement, open joints and damaged concrete. These are general condition examples, not Lake Martin permitting or design standards.

Choose the care your wall needs

Use these discussion options to define a visit, a record format and the trigger for additional investigation. Availability, scope and price must be agreed with the provider.

Seawall care planning

Request plan details

  • Professional condition review and dated photos
  • Panels, cap, joints and visible soil-loss observations
  • Drainage and weep-hole review by a qualified provider
  • Follow-up after a major storm, if arranged with the provider
  • A record of findings and recommended next steps
Let’s discuss your wall

A simple place to start.

Ask what is included, what it costs and when it can be arranged.

From a request to a written plan

  • Identify the Lake Martin parcel, affected wall section and person authorized to arrange access.
  • Share the last assessment and any new observations, with dates and lake conditions.
  • Confirm the inspected components, inaccessible areas, report format and tasks that require a separate price.
  • Add the completed visit record to the shoreline file and agree which changes warrant an earlier return.

Know when to act sooner.

New wall movement or an opening in the retained ground calls for prompt attention. Restrict use of the affected edge and contact an appropriate professional; do not wait for a calendar reminder.

The Alabama Power shoreline guidance explains shoreline management and the permission process. Keep the property’s approved drawing with the maintenance record.

Common questions

How do I get started?

Begin with the property, last known assessment and changes since that visit. Ask the provider to propose a defined scope and price for your situation.

How often should the wall be checked?

Have the assessor recommend an interval and event-based triggers. Rain damage, new movement or exposed defects during drawdown may justify an earlier visit.

Are repairs included?

A visit or written condition record does not automatically include repairs. Require the agreement to list included tasks and how additional work is authorized.

Is storm damage covered?

Confirm whether a post-storm visit is included and what it delivers. The inspection agreement does not establish insurance coverage or pay for construction unless it expressly says so.

Will I receive a condition report?

Specify the report before booking: dated images, location of observations, inspected limits and recommended follow-up. Keep it with earlier findings for comparison.

Can I use this for several properties?

Use a separate wall record and authorization for each owner. A common visit schedule still needs property-specific scope and access arrangements.

Show sourcesHide sources
  1. Lakeshore use permit request and FAQSource reviewed 2026-11-04 · official indexed text
  2. Lake Martin reservoir facts and operationsSource reviewed 2026-11-04 · official indexed text
  3. StillWaters permitsSource reviewed 2026-11-04 · official indexed text
Your next step

Request plan details

Tell us about your wall and how to reach you. Use this guide to plan the care it needs.

Getting your form ready…

Plan your next step.

Tell us where your property is and what needs attention.

Clear guidance for your shoreline project.