Coordinate seawall work with your Lake Martin neighbors.
Plan a shared assessment visit or construction access discussion while keeping each owner’s scope, permissions and price clear.

One cove. Separate property decisions.
Start with a sketch of adjoining walls, returns, docks and possible access routes. Give each wall section an owner and a proposed scope. A continuous-looking shoreline can contain different structures and repair needs.
Alabama Power’s permission belongs to the permittee, not the contractor. Each owner should confirm how the proposed coordination affects their own shoreline application. Do not assume one neighbor’s approval covers the next parcel.
Plan together. Choose for your own property.
A contractor may be able to assess adjoining Lake Martin walls on the same visit or coordinate access for several jobs. Ask for a written explanation of the shared cost before treating it as a saving.
Record the interested properties and the concern at each wall. Different materials, hidden damage and shoreline permissions can produce different recommendations even along the same cove.
Share the planning
Compare the access route and mobilization assumptions for adjoining jobs.
Check each wall
Identify retained structure, repairs and required permission at each parcel.
Keep your own choice
Approve only the scope, access and price authorized for your property.
Four simple steps
Move from neighbor interest to clearly defined property scopes.
Tell us about your area
Name the Lake Martin cove, neighborhood and concern. A preliminary discussion can start with one interested owner.
Invite nearby owners
Use an accepted group invitation to let nearby owners register themselves. Obtain their permission before sharing private property information.
Check what can be shared
Compare the proposed access, lake-level needs and construction sequence. Have the professional identify work that cannot be combined.
Decide for your property
Keep a separate scope and price for each owner. Agree how a withdrawal or changed access route affects the remaining proposals.
Who can explore a group?
Choose properties close enough to share a realistic access or delivery plan. Use 3 homes as an initial coordination target, not a promised contractor minimum. The actual project grouping depends on site review, owner decisions and approvals.
Representing an association? See the HOA project guide for ownership, board decisions and phased planning.
Common questions
Do we have to sign one contract?
Keep ownership, construction scope and payment obligations explicit. Any crossing of another parcel needs that owner’s authorization and an agreed restoration scope.
What if a neighbor drops out?
Require the proposal to explain how shared mobilization is allocated and what changes if a property withdraws. Do this before anyone relies on a group price.
Can walls have different lengths or materials?
Different wall systems can be discussed together, but may need different designs, trades and schedules. Similar location alone does not establish construction compatibility.
How do we arrange a site visit?
Identify the properties, access contacts and the question at each wall. Confirm who can authorize the visit, its price and which records the assessor needs first.
Can an association organize a group?
An authorized representative can coordinate interest. First identify common shoreline and individually owned sections so the invitation does not imply authority over another owner’s work.
Are permits shared?
Ask Alabama Power and the relevant local office how to document each owner’s scope. A single contractor visit does not turn separate parcels into one approved project.
Invite your neighbors.
Lake Martin Seawall · Neighbor seawall interest group
Do you own a nearby waterfront property?
Explore whether seawall projects could share planning and equipment setup.
Each owner reviews the work and price for their own property.
Call (256) 409-3344
Use the invitation link to join privately.
Show sourcesHide sources
- Martin, Yates & Thurlow residential guidelinesSource reviewed 2026-11-04 · official indexed text
- Lake Martin reservoir facts and operationsSource reviewed 2026-11-04 · official indexed text
- Lake Martin special construction stormwater ruleSource reviewed 2026-11-04 · official indexed text
Start a neighbor group
Tell us your cove or community and how to reach you. Use this guide to work out the next steps for your group.